NCGS Material Readiness

Pre-release. This site describes standard version 0.7.0-dev, which is in development and may change before version 1.0.0.

Whether a material that goes in with the trees on planting day (stakes, guards, compost or manure) is ready when a site is prepared: already at the site, arriving with the trees, or not planned. Preparation says what is ready; what was done is recorded per tree at planting.

Arrives with the trees

The material is not at the site yet and will be delivered with the trees on planting day.

At the site

The material is at the site, enough for the holes prepared.

Not planned

The material is not planned for this site’s planting.

This page explains the standard and does not decide conformance: only the released corpus does. It describes glossary/planting-schemes.ttl at standard version 0.7.0-dev.